During FY24, the gas processing plant at Camden Gas Project (Rosalind Park Gas Plant) has been shut-down, decommissioned and the site is currently being rehabilitated before return to the landowner.

Site

Activity

FY24

AGL Macquarie

Total area of ongoing capping and rehabilitation of Liddell Ash Dam and Ravensworth mine

Liddell Ash Dam: 116.25 ha of the former ash disposal area capped with Zone 1 capping (300mm).
Ravensworth: Approx. 1.16 Mm3 of flyash deposited into Void 5 as part of continued rehabilitation of Void 5 to achieve a free draining landform.

AGL Loy Yang

Total operational footprint

1157 ha

Progressive rehabilitation over FY24

20.78 ha

Cumulative total of rehabilitation since mining commenced

773.8 ha

Camden Gas Project

Number of the 144 well sites that have been, or are in the process of being, decommissioned, rehabilitated and returned to the respective landowner

134